Detroit, October 18, 2025
Atwater Street in Detroit will be closed starting October 20 for ongoing utility improvements tied to the I-375 project. This closure is part of a broader initiative to enhance infrastructure and improve urban roadways in Michigan. The state aims to ensure safer travel conditions for residents by addressing critical utility issues. Motorists are advised to seek alternative routes during this period as work progresses to modernize the area’s infrastructure.
Detroit, Michigan: Atwater Street Closure for Utility Improvements
Atwater Street in Detroit will close starting Monday, October 20, for ongoing utility improvements related to the I-375 project. The closure aims to enhance infrastructure and is part of broader state efforts to improve urban roadways in Michigan, ensuring safer travel conditions.
Details of the Closure
The closure of Atwater Street is part of a broader initiative to upgrade the storm sewer system along the Detroit riverfront. This project is designed to improve environmental conditions by allowing cleaner water to be discharged into the Detroit River and to alleviate pressure on the existing combined sewer system during heavy rainfall, thereby reducing the risk of flooding in adjacent neighborhoods.
Impact on Local Traffic
During the construction period, Atwater Street will be closed to vehicular traffic. However, pedestrian access will be maintained, with detours in place to guide both vehicle and non-motorized traffic around the construction zone. Specific detour routes and additional information will be provided by the Michigan Department of Transportation (MDOT) to ensure minimal disruption to daily activities.
Background on the I-375 Project
The I-375 Reconnecting Communities Project is a significant undertaking by MDOT aimed at transforming the existing I-375 freeway into a street-level boulevard. This transformation is intended to reconnect neighborhoods that were historically divided by the freeway’s construction in the 1960s. The project includes the construction of a new storm sewer outfall at the Detroit riverfront, which began on October 13, 2025. This independent upgrade provides environmental benefits for residential and business communities adjacent to I-375 and the riverfront. The installation of the new drainage outfall system will require Schweizer Place to be closed between Woodbridge and Atwater streets until early June 2026. Detours will be posted for both vehicle and non-motorized traffic. During the initial phase of the drainage work, there will be no impact on the Riverwalk. Starting this November and ending in early April 2026, the Riverwalk will close at Schweizer Place. Beforehand, crews will restore a portion of Atwater Street to accommodate pedestrians between Rivard and Beaubien streets, and bicyclists between Bates and Riopelle streets. Atwater Street will remain closed to vehicular traffic.
Project Timeline and Future Developments
The I-375 project is progressing in phases, with the current utility improvements being a critical component of the overall plan. The transformation of I-375 into a boulevard is expected to be completed by 2029. This project aims to enhance connectivity, support future development, and improve the overall quality of life for residents and businesses in the area.
Weather Forecast for October 20, 2025
For those planning to navigate the area on October 20, the weather is expected to be favorable for construction activities. The forecast for Detroit, Michigan, is as follows:
Monday, October 20: Plenty of sunshine, High: 62°F (16°C), Low: 49°F (9°C)
These conditions are anticipated to facilitate smooth construction operations and minimal disruptions to the public.
Conclusion
The closure of Atwater Street is a necessary step in the ongoing utility improvements associated with the I-375 project. While there may be temporary inconveniences, these enhancements are crucial for the long-term development and sustainability of Detroit’s infrastructure. Residents and commuters are advised to stay informed about the project’s progress and to follow detour signs to ensure safety and efficiency during the construction period.
FAQ
What is the reason for the closure of Atwater Street?
The closure is part of ongoing utility improvements tied to the I-375 project, aiming to enhance infrastructure and support future roadway developments in downtown Detroit.
When will Atwater Street reopen?
The closure is expected to last until early June 2026, as the installation of the new drainage outfall system is completed. Specific reopening dates will be provided by the Michigan Department of Transportation (MDOT).
Will pedestrian access be available during the closure?
Yes, pedestrian access will be maintained, with detours in place to guide both vehicle and non-motorized traffic around the construction zone.
How will the I-375 project affect local communities?
The I-375 Reconnecting Communities Project aims to transform the existing freeway into a street-level boulevard, reconnecting neighborhoods that were historically divided by the freeway’s construction in the 1960s. This transformation is expected to enhance connectivity, support future development, and improve the overall quality of life for residents and businesses in the area.
What is the expected completion date for the I-375 project?
The project is expected to be completed by 2029, with the current utility improvements being a critical component of the overall plan.
Project Timeline and Key Features
Phase | Description | Expected Completion |
---|---|---|
Utility Improvements | Installation of new storm sewer outfall at the Detroit riverfront, including closure of Atwater Street and Schweizer Place. | Early June 2026 |
Riverwalk Closure | Closure of the Riverwalk at Schweizer Place, with pedestrian detours to Atwater Street. | Early April 2026 |
Transformation to Boulevard | Conversion of I-375 freeway into a street-level boulevard to reconnect divided neighborhoods. | 2029 |
Deeper Dive: News & Info About This Topic
HERE Resources

Author: Construction MI News
MICHIGAN STAFF WRITER The MICHIGAN STAFF WRITER represents the experienced team at constructionminews.com, your go-to source for actionable local news and information in Michigan and beyond. Specializing in "news you can use," we cover essential topics like product reviews for personal and business needs, local business directories, politics, real estate trends, neighborhood insights, and state news affecting the area—with deep expertise drawn from years of dedicated reporting and strong community input, including local press releases and business updates. We deliver top reporting on high-value events such as the Michigan Build Expo, major infrastructure projects, and advancements in construction technology showcases. Our coverage extends to key organizations like the Associated Builders and Contractors of Michigan and the Home Builders Association of Michigan, plus leading businesses in construction and legal services that power the local economy such as CMiC Global and Miller Canfield LLP. As part of the broader network, including constructioncanews.com, constructionnynews.com, and constructiontxnews.com, we provide comprehensive, credible insights into the dynamic construction landscape across multiple states.